| Polaris handles and
carries out directly all verification and test activities for
the systems, from design phases to commissioning.
The control activities are planned
since the early phase of the project, in collaboration between
project engineering and quality control functions.
For each project it is carried
out, besides the normal control activities, a general process
verification of safety and construction aspects, which is
made before the construction activities.
Where foreseen, it is carried
out a general safety and functional verification with HAZOP
methodology, together with the client and/or other parties
involved in the project.
The plant is completely pre-assembled
in workshop, and submitted to rigorous leak tests. Where possible
(for units with lower sizes) the complete functional tests
are carried out.
The control systems are completely
checked with simulation of process signals (hardware and software).
In commissioning phase the final
verifications are carried out before the plant start-up, including
the qualifiaction of mechanical installation and connections,
the check of calibration and functionality of the loops, the
verification of utilities and compatibility with external
circuits. In such way it is further verified, from functional
and safety point of view, the integration of the plant in
the customer existing systems.
|